Short answer
Under ICH E6(R3), a sponsor can transfer trial activities to a CRO or other service provider but keeps ultimate responsibility for the trial. Inspectors expect oversight that was planned, proportionate to risk and documented as it happened: a clear split of responsibilities, agreed performance measures, regular review and decisions you can trace in the record.
What changed with ICH E6(R3)?
ICH adopted the third revision of its Good Clinical Practice guideline, E6(R3), on 6 January 2025, and regulators including the European Medicines Agency and the US FDA have since adopted it. Compared with E6(R2), it is written around principles rather than checklists. The themes that matter most for oversight are:
- Quality by design: build quality into the protocol and processes from the start.
- Focus on the factors that are critical to quality, rather than checking everything equally.
- Risk-proportionate oversight: the depth of oversight should match the risk.
- Service providers: the broader term for CROs and any vendor doing trial activities for the sponsor.
- Essential records: a wider idea than paper documents, covering data, systems and their audit trails.
What does the sponsor still own after outsourcing?
The sponsor keeps ultimate responsibility for the trial, including the quality and integrity of its data and the protection of participants. In practice the sponsor must be able to show four things:
- Which activities were transferred, to whom, and what stayed with the sponsor.
- That the service provider was qualified to do the work before it started.
- That the sponsor reviewed performance during the study, not only at the end.
- That problems led to decisions and actions that someone followed up.
What evidence of oversight do inspectors look for?
| Evidence | What it shows | Typical home |
|---|---|---|
| Responsibility matrix | Which activities were transferred and which the sponsor kept | Contract and TMF |
| Vendor qualification file | The provider was assessed before work began | Sponsor quality records |
| Oversight plan | What the sponsor reviews, how often, and who does it | TMF |
| KPI and quality reviews | Performance was measured against agreed measures | TMF, governance records |
| Governance minutes | Issues were discussed and decisions were made | TMF |
| Issue and escalation log | Problems had owners and were closed out | TMF or oversight system |
| Audit reports and CAPA follow-up | Findings were acted on, not just filed | Sponsor quality records |
| Records access arrangements | The sponsor can reach the data and records it relies on | Contract, data management plan |
A vendor oversight plan is where most of this starts.
Where do sponsors usually fall short?
- Oversight is described in the contract, but there is no record that it happened.
- KPI reports are received every month, but nothing in the record shows they led to action.
- The sponsor relies only on the CRO's own reports and never looks at underlying data or documents.
- The responsibility matrix was never updated after change orders moved work between parties.
- Subcontractors used by the CRO are invisible to the sponsor.
- Oversight evidence is assembled just before an inspection instead of filed as it happens.
How do you build oversight that is proportionate?
- Identify the factors that are critical to quality for this protocol.
- Assess the risk of each service provider and the activities it holds.
- Write the oversight plan: what you review, how often, by whom and what triggers escalation.
- Agree KPIs with the provider at contract stage, not after the first problem.
- Hold governance on a fixed rhythm and minute decisions and owners.
- Revisit the plan when the scope, the provider or the risk changes.
If an inspection is on the horizon, our inspection readiness work tests this evidence before an inspector does.
This article is general information, not regulatory or legal advice. Always check the current guideline text and the expectations of the regulators that oversee your study.
Frequently asked questions
Can a sponsor hand oversight of its CRO to another consultant?
A sponsor can bring in a consultant to carry out oversight activities, such as KPI reviews, governance and audits. The responsibility still sits with the sponsor, so the consultant's work should be part of the sponsor's documented oversight plan, with decisions taken or approved by the sponsor.
Does a small biotech need the same oversight as a large pharma company?
No. ICH E6(R3) expects oversight proportionate to the risks of the trial, not a fixed amount. A small biotech with one CRO-run study needs a focused plan built around what is critical to quality. It still needs evidence that the oversight happened and led to action.
Is a complete TMF enough to show oversight?
A complete TMF is necessary but not always enough. Inspectors look for evidence that the sponsor reviewed performance and made decisions during the study. Governance minutes, issue logs, KPI reviews and follow-up actions show that, and they need to be filed as they happen.
When should the oversight plan be written?
Before the service provider starts work, ideally while the contract is being agreed. That is when responsibilities, KPIs and access to records are easiest to settle. Writing the plan after the first problem usually means oversight evidence is missing for the start of the study.